Risborough – Augerboring Front Steer
HB Tunnelling was engaged as part of the A4010 Risborough Road works in Aylesbury, a key element of the wider High Speed Two (HS2) programme.
HB Tunnelling was engaged as part of the A4010 Risborough Road works in Aylesbury, a key element of the wider High Speed Two (HS2) programme.
Caldwell Construction Ltd commenced works for Seddon Homes in Newcastle-Under-Lyme building a new housing development and they required the installation of foul & storm outfall pipelines.
HBT were contacted by the client to construct a new sewer network for the restaurant and cinema complex adjacent to the MK Dons Football Stadium.
MV Kelly Ltd began construction on a new housing development that required the installation of a foul water pipeline.
HBT were approached by a Thames Water Framework contractor to assist with the installation of a 150mm foul pipe beneath an existing carriageway and down the embankment of a railway line, as part of a housing development.
As part of the planned major improvement works to the A3 carriageway, HB Tunnelling was appointed to carry out the shaft and tunnelling works.
Hewitson Ltd contacted HBT to look at the possible trenchless works at the prestigious Alnwick Gardens.
HBT was appointed by Morgan Sindall, to undertake the temporary works design and construct a 3.2m long x 1.8m wide x 1.2m high timber heading.
HB Tunnelling was approached by United Living Energy Ltd (ULEL) to help resolve a potential service clash during the installation of the Appleby Lodge Gas Pipeline.
HB Tunnelling supported Balfour Beatty by installing a drainage pipe from the new underpass at the modified Mytongate Junction, linking it to the pump station shaft.