Leak Sealing

As a specialist leak sealing and groundwater control contractor, HB Tunnelling provides comprehensive solutions for the refurbishment and preventative enhancement of both existing and newly constructed concrete and brickwork manhole and chamber structures.

Specialist Leak Sealing and Groundwater Control Solutions

HB Tunnelling’s expertise covers leak sealing in manholes, tunnels, car parks, buildings and drainage infrastructure, together with soil stabilisation, void grouting and structural repair works.

Our capabilities include all forms of leak-sealing systems. This includes polyurethane and elastomeric gel resin injection, cementitious grouting, hybrid silicate lining systems, and sulphate-resistant cementitious render applications to create seamless, chemical-resistant waterproof coatings.

Protective Lining Systems

We install chemical-resistant lining systems, including hybrid silicate coatings and sulphate-resistant cementitious renders, to create a seamless waterproof barrier. These provide robust protection for brick and concrete manholes, wet wells, pumping chambers, and other below-ground assets exposed to harsh environmental and chemical conditions.

Why Is Manhole Lining Necessary?

Manholes are confined spaces that are highly susceptible to deterioration, especially when exposed to:

Hydrogen Sulphide (Hâ‚‚S) Gas common in Wastewater and Petrochemical Industries

Lactic Acid found in Dairy Industry Effluent

Citric Acid and High-sugar Content from Beverage Production

Acidic and Alkaline Cleaning Agents

Manhole Failure and Rehabilitation

Over time, these conditions cause corrosion, structural damage, and significant operational risks. Our lining solutions restore structural integrity, prevent infiltration, and minimise long-term maintenance costs.

Common Issues Leading to Manhole Failure

  • Low flow rates encouraging gas formation
  • Stagnant water causing corrosive reactions
  • Acidic or alkaline degrading concrete and brickwork

Our lining systems can refurbish deteriorated manholes and chambers at a fraction of the cost and disruption of full replacement.

Social Share

Case Studies

Design in Action: View Our Project Outcomes

Our design solutions are proven in the field. Review case studies where early engagement and expert design saved time, reduced cost, and ensured seamless constructability for complex infrastructure.

Bessacarr – Caisson Shafts & Augerbore

HBT undertook the design & build of the foul & storm pump stations & manholes to adoptable standards in accordance with Yorkshire Water requirements.

bubble design

A63 Hull – Augerboring

HB Tunnelling supported Balfour Beatty by installing a drainage pipe from the new underpass at the modified Mytongate Junction, linking it to the pump station shaft.

bubble design

Appleby Lodge – Guided Auger Boring

HB Tunnelling was approached by United Living Energy Ltd (ULEL) to help resolve a potential service clash during the installation of the Appleby Lodge Gas Pipeline.

bubble design

img21

Enquire About ECI & Consultancy Works

Ready to leverage the ECI advantage? Reach out to our certified CRE/CEM specialists to discuss your project’s early design, risk mitigation strategy, and cost optimisation. Use the form below to initiate an immediate, certified consultation.

Email Us Direct: enquiries@hbtunnelling.co.uk

Call us on: 0845 388 3325