Cost Control & Estimating

Drawing on extensive experience within the tunnelling, shaft sinking and trenchless disciplines we partner with you to provide accurate cost modelling at all stages of the project. We’re with you the entire project lifecycle, providing reliable cost management for a successful project execution.

Driving Cost Certainty Across Every Stage

Working closely with designers, engineers and global supply chains, we identify practical solutions, manage risk, and refine designs to maximise value without compromising performance. Our structured approach and robust cost estimation methods provide increasingly accurate tunnelling project cost certainty, support informed decision-making, and maintain financial control throughout delivery, giving stakeholders confidence from concept to completion. 

Our estimating teams routinely compare open cut, auger boring, pipe jacking and microtunnelling methodologies to identify the optimum solution.

Feasibility Studies

We provide cost-effective early reviews of project requirements, ground conditions, and site constraints, giving confidence that specialist projects are feasible and offering indicative cost forecasts for budgeting and funding decisions. Including methodology selection and preliminary shaft sizing.

Optioneering

Collaborating with design teams, engineers, and global suppliers to evaluate options, meet deadlines, maximise value, and identify the best overall solutions for project delivery.

Construction Method Selection & Value Engineering

Reviewing/revisiting an agreed design to identify waste or opportunities for alternative methods and materials to reduce overall cost without reducing efficacy of chosen solution. Examples include shaft optimisation, drive length optimisation and alternative trenchless installation methodologies.

Cost Modelling

Throughout design, we refine cost forecasts and risk registers, boosting stakeholder confidence and keeping you informed of impacts from design decisions and market changes.

Cost Control

Establishing an agreed Forecasted Cost to Complete prior to commencing construction. Monitoring cost-to-date figures and liabilities throughout the construction process, regular and accurate reporting to identify and disclose savings, overspends, variations and contentious issues thereby maintaining trust and improving working relationships throughout the project team.

Social Share

Case Studies

Design in Action: View Our Project Outcomes

Our design solutions are proven in the field. Review case studies where early engagement and expert design saved time, reduced cost, and ensured seamless constructability for complex infrastructure.

Bessacarr – Caisson Shafts & Augerbore

HBT undertook the design & build of the foul & storm pump stations & manholes to adoptable standards in accordance with Yorkshire Water requirements.

bubble design

A63 Hull – Augerboring

HB Tunnelling supported Balfour Beatty by installing a drainage pipe from the new underpass at the modified Mytongate Junction, linking it to the pump station shaft.

bubble design

Appleby Lodge – Guided Auger Boring

HB Tunnelling was approached by United Living Energy Ltd (ULEL) to help resolve a potential service clash during the installation of the Appleby Lodge Gas Pipeline.

bubble design

img21

Enquire About ECI & Consultancy Works

Ready to leverage the ECI advantage? Reach out to our certified CRE/CEM specialists to discuss your project’s early design, risk mitigation strategy, and cost optimisation. Use the form below to initiate an immediate, certified consultation.