Specialist Trenchless & Tunnelling Services Plant Hire

We offer early contractor involvement and specialist consultation, providing a single point of contact to deliver cost-effective, constructable, and fully assured design solutions.

Early Contractor Involvement (ECI): Mitigating Risk from Concept.

Our ECI and Consultancy services are designed to engage early in the design process, providing essential construction expertise and technical advice that de-risks the execution phase. We work collaboratively to identify novel, value-engineered solutions where standard designs may not be optimal.

The ECI Advantage

We partner with you from the initial design development phases, ensuring there are no surprises in construction. Our multi-disciplinary support chain provides assistance on complex schemes, delivering surveys and investigations.

Key Consultancy Services

We provide targeted expert advice across all aspects of trenchless technology and ground engineering, structured into four core areas:

Geotechnical & Ground Investigation

Comprehensive site investigation (from trial pit to rotary) and expert geotechnical advice to fully understand ground strata, conditions, and associated risks.

Feasibility Studies & Assessment

Detailed initial studies, ground assessments, and project viability analysis to define the optimal tunnelling approach and scope.

Risk & Temporary Works Design

Specialist design for temporary structures and crucial calculations for heave and settlement to protect existing infrastructure and assets.

Technique Specification & PM

Providing precise technique specifications, detailed scope definition, and professional project management support for smooth site execution.

Rail & Underground Assurance

We are well-versed in the assurance of Network Rail and London Underground projects. Our team includes accepted Contractors Responsible Engineers (CRE) and Contractors Engineering Managers (CEM) for major civil schemes, ensuring compliance with standards like NR – Forms A & B and CD622 Highways.

Social Share

Case Studies

Design in Action: View Our Project Outcomes

Our design solutions are proven in the field. Review case studies where early engagement and expert design saved time, reduced cost, and ensured seamless constructability for complex infrastructure.

Bessacarr – Caisson Shafts & Augerbore

HBT undertook the design & build of the foul & storm pump stations & manholes to adoptable standards in accordance with Yorkshire Water requirements.

bubble design

A63 Hull – Augerboring

HB Tunnelling supported Balfour Beatty by installing a drainage pipe from the new underpass at the modified Mytongate Junction, linking it to the pump station shaft.

bubble design

Appleby Lodge – Guided Auger Boring

HB Tunnelling was approached by United Living Energy Ltd (ULEL) to help resolve a potential service clash during the installation of the Appleby Lodge Gas Pipeline.

bubble design

img21

Enquire About ECI & Consultancy Works

Ready to leverage the ECI advantage? Reach out to our certified CRE/CEM specialists to discuss your project’s early design, risk mitigation strategy, and cost optimisation. Use the form below to initiate an immediate, certified consultation.

Email Us Direct: enquiries@hbtunnelling.co.uk

Call us on: 0845 388 3325